Mount Fuji — Yoshida Trail
Japan's highest mountain by the route four climbers in five take. From the 5th station at 2,305 m the path works up the volcanic cone past a line of mountain huts to the crater rim at 3,776 m, and comes down a separate track of red cinder. Almost everyone breaks the climb at a hut and goes up in the dark for the sunrise. Open only in season, roughly early July to early September. [Route details] Start / End: Fuji Subaru Line 5th Station (2,305 m) 15.44 km round trip · 2240 m to 3699 m · climb 1528 m [Good to know] - The official climbing site gives 15.1 km (7.5 up, 7.6 down) and about 1,450 m of climbing; this line is 15.44 km and 1528 m. - The two OpenStreetMap relations for the ascent and descent both run all the way down to Fujiyoshida town on the historic pilgrim path. Cut where the terrain model reads 2,305 m and joined to the 5th station by 1.86 km of path network at each end. - The terrain model reads 3699 m at the rim against the mountain's 3,776 m — a 90 m grid cannot hold a summit that sharp. - Altitude sickness is the usual reason people turn back, not the grade. - Elevation is sampled from a terrain model at 300 m spacing, not recorded on the ground.
주간 날씨
날씨 불러오는 중…
댓글 0
불러오는 중…
